El Dorado Pkwy over Los Coches Creek
FairSan Diego County, California · 300 S of HWY 8 · Structure no. 57C0377
- Built
- 1983
- 42 years old
- Condition
- Fair
- inspected March 2024
- Type
- Slab
- Concrete Continuous
- Length
- 66 ft
- 2 main spans
- Daily traffic
- 156
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
El Dorado Pkwy over Los Coches Creek is a concrete continuous slab carrying El Dorado Pkwy over Los Coches Creek in San Diego County, California. It was built in 1983, so it is 42 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 156 vehicles a day, roughly 2% of them trucks, projected to reach 201 by 2041. The structure is 66 ft (20.1 m) long and 34 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was El Dorado Pkwy over Los Coches Creek built?
It was built in 1983, making it 42 years old in 2025.
What condition is El Dorado Pkwy over Los Coches Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does El Dorado Pkwy over Los Coches Creek carry?
About 156 vehicles per day (2018 count), of which roughly 2% are trucks.
How long is El Dorado Pkwy over Los Coches Creek?
The structure is 66 ft (20.1 m) long with a longest span of 30 ft (9.1 m) and a deck 34 ft wide.
Who owns El Dorado Pkwy over Los Coches Creek?
It is owned by the County Highway Agency.