US Bridges

San Vicente RD over San Vicente Creek Trib

Good

San Diego County, California · 150 Ft E/O Ramona Oaks RD · Structure no. 57C0369

Built
1973
52 years old
Condition
Good
inspected December 2022
Type
Culvert
Concrete Continuous
Length
69 ft
4 main spans
Daily traffic
889
2022 count
Owner
County
County Highway Agency

About this bridge

San Vicente RD over San Vicente Creek Trib is a concrete continuous culvert carrying San Vicente RD over San Vicente Creek Trib in San Diego County, California. It was built in 1973, so it is 52 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 889 vehicles a day, roughly 2% of them trucks, projected to reach 936 by 2044. The structure is 69 ft (21 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSan Vicente RD
CrossesSan Vicente Creek Trib
Location150 Ft E/O Ramona Oaks RD
RouteCounty Highway 0
Coordinates33.00177, -116.80185
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans4
Design loadUnknown
Structure length69 ft (21 m)
Longest span16 ft (5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic889 (2022)
Projected traffic936 by 2044
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was San Vicente RD over San Vicente Creek Trib built?

It was built in 1973, making it 52 years old in 2025.

What condition is San Vicente RD over San Vicente Creek Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2022.

How much traffic does San Vicente RD over San Vicente Creek Trib carry?

About 889 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is San Vicente RD over San Vicente Creek Trib?

The structure is 69 ft (21 m) long with a longest span of 16 ft (5 m).

Who owns San Vicente RD over San Vicente Creek Trib?

It is owned by the County Highway Agency.