US Bridges

El Camino Real over San Elijo Lagoon Trib

Good

San Diego County, California · 15FT N/O LA Orilla RD · Structure no. 57C0315

Built
1950
75 years old, rebuilt 1966
Condition
Good
inspected May 2023
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
3,948
2016 count
Owner
County
County Highway Agency

About this bridge

El Camino Real over San Elijo Lagoon Trib is a concrete culvert carrying El Camino Real over San Elijo Lagoon Trib in San Diego County, California. It was built in 1950 and reconstructed in 1966, so it is 75 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,948 vehicles a day, roughly 1% of them trucks, projected to reach 6,441 by 2045. The structure is 22 ft (6.7 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEl Camino Real
CrossesSan Elijo Lagoon Trib
Location15FT N/O LA Orilla RD
RouteCity Street 0
Coordinates33.01093, -117.23941
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width41 ft (12.6 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,948 (2016)
Projected traffic6,441 by 2045
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was El Camino Real over San Elijo Lagoon Trib built?

It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1966.

What condition is El Camino Real over San Elijo Lagoon Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does El Camino Real over San Elijo Lagoon Trib carry?

About 3,948 vehicles per day (2016 count), of which roughly 1% are trucks.

How long is El Camino Real over San Elijo Lagoon Trib?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 41 ft wide.

Who owns El Camino Real over San Elijo Lagoon Trib?

It is owned by the County Highway Agency.