US Bridges

El Camino Real over Encinitas Creek

Good

San Diego County, California · At Olivenhain / Leucadia · Structure no. 57C0189

Built
1962
63 years old, rebuilt 1997
Condition
Good
inspected April 2024
Type
Slab
Concrete Continuous
Length
50 ft
2 main spans
Daily traffic
29,047
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

El Camino Real over Encinitas Creek is a concrete continuous slab carrying El Camino Real over Encinitas Creek in San Diego County, California. It was built in 1962 and reconstructed in 1997, so it is 63 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 29,047 vehicles a day, roughly 2% of them trucks, projected to reach 32,415 by 2041. The structure is 50 ft (15.2 m) long and 174 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesEl Camino Real
CrossesEncinitas Creek
LocationAt Olivenhain / Leucadia
RouteCounty Highway 0
Coordinates33.06729, -117.26204
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.6 US tons
Inventory rating30 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length50 ft (15.2 m)
Longest span24 ft (7.3 m)
Deck width174 ft (53 m)
Roadway width131 ft (40 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,047 (2020)
Projected traffic32,415 by 2041
Trucks2%
Lanes on structure10
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was El Camino Real over Encinitas Creek built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1997.

What condition is El Camino Real over Encinitas Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does El Camino Real over Encinitas Creek carry?

About 29,047 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is El Camino Real over Encinitas Creek?

The structure is 50 ft (15.2 m) long with a longest span of 24 ft (7.3 m) and a deck 174 ft wide.

Who owns El Camino Real over Encinitas Creek?

It is owned by the City or Municipal Highway Agency.