Sorrento Valley Bl over Soledad Canyon Creek
FairSan Diego County, California · 0.05 MI S/W Sorento Vl RD · Structure no. 57C0098
- Built
- 1966
- 59 years old, rebuilt 1990
- Condition
- Fair
- inspected September 2023
- Type
- Slab
- Concrete Continuous
- Length
- 92 ft
- 3 main spans
- Daily traffic
- 19,300
- 2016 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Sorrento Valley Bl over Soledad Canyon Creek is a concrete continuous slab carrying Sorrento Valley Bl over Soledad Canyon Creek in San Diego County, California. It was built in 1966 and reconstructed in 1990, so it is 59 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19,300 vehicles a day, roughly 1% of them trucks, projected to reach 22,446 by 2040. The structure is 92 ft (28 m) long and 100 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sorrento Valley Bl over Soledad Canyon Creek built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1990.
What condition is Sorrento Valley Bl over Soledad Canyon Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Sorrento Valley Bl over Soledad Canyon Creek carry?
About 19,300 vehicles per day (2016 count), of which roughly 1% are trucks.
How long is Sorrento Valley Bl over Soledad Canyon Creek?
The structure is 92 ft (28 m) long with a longest span of 36 ft (11 m) and a deck 100 ft wide.
Who owns Sorrento Valley Bl over Soledad Canyon Creek?
It is owned by the City or Municipal Highway Agency.