US Bridges

Jimmy Durante Blvd over San Dieguito River

Good

San Diego County, California · 0.75M S/O Via De LA Valle · Structure no. 57C0043

Built
1982
43 years old
Condition
Good
inspected April 2024
Type
Slab
Prestressed Concrete
Length
263 ft
6 main spans
Daily traffic
10,844
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Jimmy Durante Blvd over San Dieguito River is a prestressed concrete slab carrying Jimmy Durante Blvd over San Dieguito River in San Diego County, California. It was built in 1982, so it is 43 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,844 vehicles a day, roughly 1% of them trucks, projected to reach 18,922 by 2041. The structure is 263 ft (80.2 m) long and 57 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesJimmy Durante Blvd
CrossesSan Dieguito River
Location0.75M S/O Via De LA Valle
RouteCity Street 0
Coordinates32.97061, -117.2627
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.7 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length263 ft (80.2 m)
Longest span43 ft (13.1 m)
Deck width57 ft (17.3 m)
Roadway width39 ft (11.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,844 (2020)
Projected traffic18,922 by 2041
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Jimmy Durante Blvd over San Dieguito River built?

It was built in 1982, making it 43 years old in 2025.

What condition is Jimmy Durante Blvd over San Dieguito River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Jimmy Durante Blvd over San Dieguito River carry?

About 10,844 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Jimmy Durante Blvd over San Dieguito River?

The structure is 263 ft (80.2 m) long with a longest span of 43 ft (13.1 m) and a deck 57 ft wide.

Who owns Jimmy Durante Blvd over San Dieguito River?

It is owned by the City or Municipal Highway Agency.