State Route 76 WB over Sdcwa Pipelines
GoodSan Diego County, California · 11-SD-076-R16.33 · Structure no. 57 1235L
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 148 ft
- 1 main span
- Daily traffic
- 13,800
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
State Route 76 WB over Sdcwa Pipelines is a prestressed concrete stringer/multi-beam or girder carrying State Route 76 WB over Sdcwa Pipelines in San Diego County, California. It was built in 2017, so it is 8 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,800 vehicles a day, roughly 5% of them trucks, projected to reach 19,400 by 2042. The structure is 148 ft (45.1 m) long and 47 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was State Route 76 WB over Sdcwa Pipelines built?
It was built in 2017, making it 8 years old in 2025.
What condition is State Route 76 WB over Sdcwa Pipelines in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does State Route 76 WB over Sdcwa Pipelines carry?
About 13,800 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is State Route 76 WB over Sdcwa Pipelines?
The structure is 148 ft (45.1 m) long with a longest span of 142 ft (43.4 m) and a deck 47 ft wide.
Who owns State Route 76 WB over Sdcwa Pipelines?
It is owned by the State Highway Agency.