US Bridges

State Route 76 WB over Sdcwa Pipelines

Good

San Diego County, California · 11-SD-076-R16.33 · Structure no. 57 1235L

Built
2017
8 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
148 ft
1 main span
Daily traffic
13,800
2016 count
Owner
State
State Highway Agency

About this bridge

State Route 76 WB over Sdcwa Pipelines is a prestressed concrete stringer/multi-beam or girder carrying State Route 76 WB over Sdcwa Pipelines in San Diego County, California. It was built in 2017, so it is 8 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,800 vehicles a day, roughly 5% of them trucks, projected to reach 19,400 by 2042. The structure is 148 ft (45.1 m) long and 47 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesState Route 76 WB
CrossesSdcwa Pipelines
Location11-SD-076-R16.33
RouteState Highway 76
Coordinates33.32199, -117.16904
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations on dry land well above flood water elevations
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length148 ft (45.1 m)
Longest span142 ft (43.4 m)
Deck width47 ft (14.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,800 (2016)
Projected traffic19,400 by 2042
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was State Route 76 WB over Sdcwa Pipelines built?

It was built in 2017, making it 8 years old in 2025.

What condition is State Route 76 WB over Sdcwa Pipelines in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does State Route 76 WB over Sdcwa Pipelines carry?

About 13,800 vehicles per day (2016 count), of which roughly 5% are trucks.

How long is State Route 76 WB over Sdcwa Pipelines?

The structure is 148 ft (45.1 m) long with a longest span of 142 ft (43.4 m) and a deck 47 ft wide.

Who owns State Route 76 WB over Sdcwa Pipelines?

It is owned by the State Highway Agency.