I-805 SB Off Ramp over Decorative Median
GoodSan Diego County, California · 11-SD-805-5.09 · Structure no. 57 1223E
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 279 ft
- 3 main spans
- Daily traffic
- 7,500
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
I-805 SB Off Ramp over Decorative Median is a prestressed concrete continuous box beam or girders - multiple carrying I-805 SB Off Ramp over Decorative Median in San Diego County, California. It was built in 2017, so it is 8 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,500 vehicles a day, roughly 1% of them trucks, projected to reach 12,500 by 2042. The structure is 279 ft (85 m) long and 71 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-805 SB Off Ramp over Decorative Median built?
It was built in 2017, making it 8 years old in 2025.
What condition is I-805 SB Off Ramp over Decorative Median in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does I-805 SB Off Ramp over Decorative Median carry?
About 7,500 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is I-805 SB Off Ramp over Decorative Median?
The structure is 279 ft (85 m) long with a longest span of 125 ft (38.1 m) and a deck 71 ft wide.
Who owns I-805 SB Off Ramp over Decorative Median?
It is owned by the State Highway Agency.