Route 905 WB over Spring Canyon
FairSan Diego County, California · 11-SD-905-R7.38 · Structure no. 57 1155L
- Built
- 2012
- 13 years old
- Condition
- Fair
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 253 ft
- 2 main spans
- Daily traffic
- 16,250
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Route 905 WB over Spring Canyon is a prestressed concrete continuous box beam or girders - multiple carrying Route 905 WB over Spring Canyon in San Diego County, California. It was built in 2012, so it is 13 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,250 vehicles a day, roughly 7% of them trucks, projected to reach 55,784 by 2042. The structure is 253 ft (77 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Route 905 WB over Spring Canyon built?
It was built in 2012, making it 13 years old in 2025.
What condition is Route 905 WB over Spring Canyon in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Route 905 WB over Spring Canyon carry?
About 16,250 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is Route 905 WB over Spring Canyon?
The structure is 253 ft (77 m) long with a longest span of 126 ft (38.5 m) and a deck 59 ft wide.
Who owns Route 905 WB over Spring Canyon?
It is owned by the State Highway Agency.