US Bridges

Bernardod\pomerado over Interstate 15 W/Hov

Fair

San Diego County, California · 11-SD-015-M26.03 · Structure no. 57 1129

Built
2008
17 years old
Condition
Fair
inspected November 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
385 ft
3 main spans
Daily traffic
2,700
2020 count
Owner
State
State Highway Agency

About this bridge

Bernardod\pomerado over Interstate 15 W/Hov is a prestressed concrete continuous box beam or girders - multiple carrying Bernardod\pomerado over Interstate 15 W/Hov in San Diego County, California. It was built in 2008, so it is 17 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,700 vehicles a day, roughly 1% of them trucks, projected to reach 5,221 by 2041. The structure is 385 ft (117.4 m) long and 69 ft wide.

CarriesBernardod\pomerado
CrossesInterstate 15 W/Hov
Location11-SD-015-M26.03
RouteCity Street 0
Coordinates33.05585, -117.07214
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length385 ft (117.4 m)
Longest span151 ft (46 m)
Deck width69 ft (21 m)
Roadway width55 ft (16.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,700 (2020)
Projected traffic5,221 by 2041
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Bernardod\pomerado over Interstate 15 W/Hov built?

It was built in 2008, making it 17 years old in 2025.

What condition is Bernardod\pomerado over Interstate 15 W/Hov in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Bernardod\pomerado over Interstate 15 W/Hov carry?

About 2,700 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Bernardod\pomerado over Interstate 15 W/Hov?

The structure is 385 ft (117.4 m) long with a longest span of 151 ft (46 m) and a deck 69 ft wide.

Who owns Bernardod\pomerado over Interstate 15 W/Hov?

It is owned by the State Highway Agency.