US Bridges

E52-S67 Connector over Magnolia Avenue

Fair

San Diego County, California · 11-SD-052-17.27-SNT · Structure no. 57 1120G

Built
2011
14 years old
Condition
Fair
inspected April 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
1,576 ft
10 main spans
Daily traffic
19,600
2019 count
Owner
State
State Highway Agency

About this bridge

E52-S67 Connector over Magnolia Avenue is a prestressed concrete continuous box beam or girders - multiple carrying E52-S67 Connector over Magnolia Avenue in San Diego County, California. It was built in 2011, so it is 14 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 19,600 vehicles a day, roughly 4% of them trucks, projected to reach 22,000 by 2041. The structure is 1,576 ft (480.5 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesE52-S67 Connector
CrossesMagnolia Avenue
Location11-SD-052-17.27-SNT
RouteU.S. Route 52
Coordinates32.83155, -116.96299
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans10
Design loadHS 20 + Mod
Structure length1,576 ft (480.5 m)
Longest span192 ft (58.5 m)
Deck width41 ft (12.6 m)
Roadway width38 ft (11.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,600 (2019)
Projected traffic22,000 by 2041
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was E52-S67 Connector over Magnolia Avenue built?

It was built in 2011, making it 14 years old in 2025.

What condition is E52-S67 Connector over Magnolia Avenue in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does E52-S67 Connector over Magnolia Avenue carry?

About 19,600 vehicles per day (2019 count), of which roughly 4% are trucks.

How long is E52-S67 Connector over Magnolia Avenue?

The structure is 1,576 ft (480.5 m) long with a longest span of 192 ft (58.5 m) and a deck 41 ft wide.

Who owns E52-S67 Connector over Magnolia Avenue?

It is owned by the State Highway Agency.