E94-S125 Connector over Broadway
FairSan Diego County, California · 11-SD-094-R9.58R-LMGR · Structure no. 57 1055G
- Built
- 2003
- 22 years old
- Condition
- Fair
- inspected October 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 1,353 ft
- 7 main spans
- Daily traffic
- 15,500
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
E94-S125 Connector over Broadway is a prestressed concrete continuous box beam or girders - multiple carrying E94-S125 Connector over Broadway in San Diego County, California. It was built in 2003, so it is 22 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,500 vehicles a day, roughly 4% of them trucks, projected to reach 18,984 by 2041. The structure is 1,353 ft (412.5 m) long and 42 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E94-S125 Connector over Broadway built?
It was built in 2003, making it 22 years old in 2025.
What condition is E94-S125 Connector over Broadway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does E94-S125 Connector over Broadway carry?
About 15,500 vehicles per day (2020 count), of which roughly 4% are trucks.
How long is E94-S125 Connector over Broadway?
The structure is 1,353 ft (412.5 m) long with a longest span of 210 ft (64 m) and a deck 42 ft wide.
Who owns E94-S125 Connector over Broadway?
It is owned by the State Highway Agency.