Carmel MTN-N5 on over Carmel Valley RD
GoodSan Diego County, California · 11-SD-005-R32.88-SD · Structure no. 57 0991S
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected January 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 565 ft
- 5 main spans
- Daily traffic
- 5,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Carmel MTN-N5 on over Carmel Valley RD is a prestressed concrete continuous box beam or girders - multiple carrying Carmel MTN-N5 on over Carmel Valley RD in San Diego County, California. It was built in 1998, so it is 27 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,000 vehicles a day, roughly 5% of them trucks, projected to reach 6,328 by 2047. The structure is 565 ft (172.2 m) long and 42 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Carmel MTN-N5 on over Carmel Valley RD built?
It was built in 1998, making it 27 years old in 2025.
What condition is Carmel MTN-N5 on over Carmel Valley RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Carmel MTN-N5 on over Carmel Valley RD carry?
About 5,000 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is Carmel MTN-N5 on over Carmel Valley RD?
The structure is 565 ft (172.2 m) long with a longest span of 125 ft (38.1 m) and a deck 42 ft wide.
Who owns Carmel MTN-N5 on over Carmel Valley RD?
It is owned by the State Highway Agency.