E52-N15 Connector over S15-E52 15 52 N15-W52
FairSan Diego County, California · 11-SD-052-7.24-SD · Structure no. 57 0968G
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected May 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 1,338 ft
- 9 main spans
- Daily traffic
- 35,500
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
E52-N15 Connector over S15-E52 15 52 N15-W52 is a prestressed concrete continuous box beam or girders - multiple carrying E52-N15 Connector over S15-E52 15 52 N15-W52 in San Diego County, California. It was built in 1988, so it is 37 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 35,500 vehicles a day, roughly 2% of them trucks, projected to reach 36,000 by 2043. The structure is 1,338 ft (407.8 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E52-N15 Connector over S15-E52 15 52 N15-W52 built?
It was built in 1988, making it 37 years old in 2025.
What condition is E52-N15 Connector over S15-E52 15 52 N15-W52 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does E52-N15 Connector over S15-E52 15 52 N15-W52 carry?
About 35,500 vehicles per day (2016 count), of which roughly 2% are trucks.
How long is E52-N15 Connector over S15-E52 15 52 N15-W52?
The structure is 1,338 ft (407.8 m) long with a longest span of 176 ft (53.6 m) and a deck 38 ft wide.
Who owns E52-N15 Connector over S15-E52 15 52 N15-W52?
It is owned by the State Highway Agency.