E8-EL Cajon Bl Off over Chase Ave
GoodSan Diego County, California · 11-SD-008-13.77-ECJ · Structure no. 57 0956S
- Built
- 1986
- 39 years old
- Condition
- Good
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 267 ft
- 3 main spans
- Daily traffic
- 27,000
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
E8-EL Cajon Bl Off over Chase Ave is a prestressed concrete continuous box beam or girders - multiple carrying E8-EL Cajon Bl Off over Chase Ave in San Diego County, California. It was built in 1986, so it is 39 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 27,000 vehicles a day, roughly 1% of them trucks, projected to reach 35,944 by 2044. The structure is 267 ft (81.4 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E8-EL Cajon Bl Off over Chase Ave built?
It was built in 1986, making it 39 years old in 2025.
What condition is E8-EL Cajon Bl Off over Chase Ave in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does E8-EL Cajon Bl Off over Chase Ave carry?
About 27,000 vehicles per day (2014 count), of which roughly 1% are trucks.
How long is E8-EL Cajon Bl Off over Chase Ave?
The structure is 267 ft (81.4 m) long with a longest span of 105 ft (32 m) and a deck 36 ft wide.
Who owns E8-EL Cajon Bl Off over Chase Ave?
It is owned by the State Highway Agency.