S5-E54 Connector over I 5 Sweetwater Mtdb Lrt
GoodSan Diego County, California · 11-SD-005-9.40-NATC · Structure no. 57 0946F
- Built
- 1988
- 37 years old
- Condition
- Good
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 1,458 ft
- 9 main spans
- Daily traffic
- 29,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
S5-E54 Connector over I 5 Sweetwater Mtdb Lrt is a prestressed concrete continuous box beam or girders - multiple carrying S5-E54 Connector over I 5 Sweetwater Mtdb Lrt in San Diego County, California. It was built in 1988, so it is 37 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 29,000 vehicles a day, roughly 6% of them trucks, projected to reach 36,064 by 2040. The structure is 1,458 ft (444.4 m) long and 42 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S5-E54 Connector over I 5 Sweetwater Mtdb Lrt built?
It was built in 1988, making it 37 years old in 2025.
What condition is S5-E54 Connector over I 5 Sweetwater Mtdb Lrt in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does S5-E54 Connector over I 5 Sweetwater Mtdb Lrt carry?
About 29,000 vehicles per day (2020 count), of which roughly 6% are trucks.
How long is S5-E54 Connector over I 5 Sweetwater Mtdb Lrt?
The structure is 1,458 ft (444.4 m) long with a longest span of 175 ft (53.3 m) and a deck 42 ft wide.
Who owns S5-E54 Connector over I 5 Sweetwater Mtdb Lrt?
It is owned by the State Highway Agency.