US Bridges

S5-S75 Connector over Cesar Logan National NE

Good

San Diego County, California · 11-SD-005-R14.16-SD · Structure no. 57 0939H

Built
1969
56 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
2,360 ft
25 main spans
Daily traffic
37,500
2020 count
Owner
State
State Highway Agency

About this bridge

S5-S75 Connector over Cesar Logan National NE is a prestressed concrete stringer/multi-beam or girder carrying S5-S75 Connector over Cesar Logan National NE in San Diego County, California. It was built in 1969, so it is 56 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 37,500 vehicles a day, roughly 4% of them trucks, projected to reach 25,760 by 2040. The structure is 2,360 ft (719.3 m) long and 33 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesS5-S75 Connector
CrossesCesar Logan National NE
Location11-SD-005-R14.16-SD
RouteInterstate 5
Coordinates32.7001, -117.14359
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.3 US tons
Inventory rating27.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans25
Design loadHS 20
Structure length2,360 ft (719.3 m)
Longest span118 ft (36 m)
Deck width33 ft (10.2 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic37,500 (2020)
Projected traffic25,760 by 2040
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollToll bridge
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S5-S75 Connector over Cesar Logan National NE built?

It was built in 1969, making it 56 years old in 2025.

What condition is S5-S75 Connector over Cesar Logan National NE in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does S5-S75 Connector over Cesar Logan National NE carry?

About 37,500 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is S5-S75 Connector over Cesar Logan National NE?

The structure is 2,360 ft (719.3 m) long with a longest span of 118 ft (36 m) and a deck 33 ft wide.

Who owns S5-S75 Connector over Cesar Logan National NE?

It is owned by the State Highway Agency.