US Bridges

Camino Del Rey over Moosa Canyon Creek

Good

San Diego County, California · 11-SD-000-R41.81 · Structure no. 57 0932

Built
1980
45 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete Continuous
Length
58 ft
5 main spans
Daily traffic
1,000
2020 count
Owner
State
State Highway Agency

About this bridge

Camino Del Rey over Moosa Canyon Creek is a concrete continuous culvert carrying Camino Del Rey over Moosa Canyon Creek in San Diego County, California. It was built in 1980, so it is 45 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 1% of them trucks, projected to reach 1,028 by 2045. The structure is 58 ft (17.7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCamino Del Rey
CrossesMoosa Canyon Creek
Location11-SD-000-R41.81
RouteCounty Highway 0
Coordinates33.26661, -117.15748
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans5
Design loadHS 20
Structure length58 ft (17.7 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2020)
Projected traffic1,028 by 2045
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Camino Del Rey over Moosa Canyon Creek built?

It was built in 1980, making it 45 years old in 2025.

What condition is Camino Del Rey over Moosa Canyon Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Camino Del Rey over Moosa Canyon Creek carry?

About 1,000 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Camino Del Rey over Moosa Canyon Creek?

The structure is 58 ft (17.7 m) long with a longest span of 12 ft (3.7 m).

Who owns Camino Del Rey over Moosa Canyon Creek?

It is owned by the State Highway Agency.