State Route 52 EB over San Clemente Creek
GoodSan Diego County, California · 11-SD-052-3.85-SD · Structure no. 57 0921R
- Built
- 1987
- 38 years old
- Condition
- Good
- inspected February 2025
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 133 ft
- 1 main span
- Daily traffic
- 50,500
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
State Route 52 EB over San Clemente Creek is a prestressed concrete box beam or girders - single or spread carrying State Route 52 EB over San Clemente Creek in San Diego County, California. It was built in 1987, so it is 38 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50,500 vehicles a day, roughly 4% of them trucks, projected to reach 57,431 by 2043. The structure is 133 ft (40.5 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was State Route 52 EB over San Clemente Creek built?
It was built in 1987, making it 38 years old in 2025.
What condition is State Route 52 EB over San Clemente Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does State Route 52 EB over San Clemente Creek carry?
About 50,500 vehicles per day (2019 count), of which roughly 4% are trucks.
How long is State Route 52 EB over San Clemente Creek?
The structure is 133 ft (40.5 m) long with a longest span of 131 ft (39.9 m) and a deck 42 ft wide.
Who owns State Route 52 EB over San Clemente Creek?
It is owned by the State Highway Agency.