SB MORENA-W8 Onrmp over Pedestrian Walkway
GoodSan Diego County, California · 11-SD-008-R0.35-SD · Structure no. 57 0917K
- Built
- 1969
- 56 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 147 ft
- 2 main spans
- Daily traffic
- 5,000
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
SB MORENA-W8 Onrmp over Pedestrian Walkway is a steel continuous stringer/multi-beam or girder carrying SB MORENA-W8 Onrmp over Pedestrian Walkway in San Diego County, California. It was built in 1969, so it is 56 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,000 vehicles a day, roughly 1% of them trucks, projected to reach 10,304 by 2042. The structure is 147 ft (44.8 m) long and 26 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SB MORENA-W8 Onrmp over Pedestrian Walkway built?
It was built in 1969, making it 56 years old in 2025.
What condition is SB MORENA-W8 Onrmp over Pedestrian Walkway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does SB MORENA-W8 Onrmp over Pedestrian Walkway carry?
About 5,000 vehicles per day (2014 count), of which roughly 1% are trucks.
How long is SB MORENA-W8 Onrmp over Pedestrian Walkway?
The structure is 147 ft (44.8 m) long with a longest span of 82 ft (25 m) and a deck 26 ft wide.
Who owns SB MORENA-W8 Onrmp over Pedestrian Walkway?
It is owned by the State Highway Agency.