Interstate 15 NB over Mission Avenue

Fair

San Diego County, California · 11-SD-015-R31.32-ESD · Structure no. 57 0813R

Built
1977
48 years old, rebuilt 2011
Condition
Fair
inspected March 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
192 ft
3 main spans
Daily traffic
97,000
2018 count
Owner
State
State Highway Agency

About this bridge

Interstate 15 NB over Mission Avenue is a concrete continuous box beam or girders - multiple carrying Interstate 15 NB over Mission Avenue in San Diego County, California. It was built in 1977 and reconstructed in 2011, so it is 48 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 97,000 vehicles a day, roughly 7% of them trucks, projected to reach 168,000 by 2042. The structure is 192 ft (58.6 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesInterstate 15 NB
CrossesMission Avenue
Location11-SD-015-R31.32-ESD
RouteInterstate 15
Coordinates33.12439, -117.10365
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.3 US tons
Inventory rating34.3 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length192 ft (58.6 m)
Longest span90 ft (27.4 m)
Deck width82 ft (25.1 m)
Roadway width79 ft (24.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic97,000 (2018)
Projected traffic168,000 by 2042
Trucks7%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 15 NB over Mission Avenue built?

It was built in 1977, making it 48 years old in 2025. It was reconstructed in 2011.

What condition is Interstate 15 NB over Mission Avenue in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Interstate 15 NB over Mission Avenue carry?

About 97,000 vehicles per day (2018 count), of which roughly 7% are trucks.

How long is Interstate 15 NB over Mission Avenue?

The structure is 192 ft (58.6 m) long with a longest span of 90 ft (27.4 m) and a deck 82 ft wide.

Who owns Interstate 15 NB over Mission Avenue?

It is owned by the State Highway Agency.