US Bridges

EUCLID-S805 Onramp over S805 - E & W 54 Conns

Fair

San Diego County, California · 11-SD-805-8.96 · Structure no. 57 0749K

Built
1974
51 years old
Condition
Fair
inspected June 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
350 ft
4 main spans
Daily traffic
5,600
2022 count
Owner
State
State Highway Agency

About this bridge

EUCLID-S805 Onramp over S805 - E & W 54 Conns is a concrete continuous box beam or girders - multiple carrying EUCLID-S805 Onramp over S805 - E & W 54 Conns in San Diego County, California. It was built in 1974, so it is 51 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,600 vehicles a day, roughly 2% of them trucks, projected to reach 7,857 by 2044. The structure is 350 ft (106.7 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesEUCLID-S805 Onramp
CrossesS805 - E & W 54 Conns
Location11-SD-805-8.96
RouteInterstate 805
Coordinates32.65946, -117.07619
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.5 US tons
Inventory rating45.3 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length350 ft (106.7 m)
Longest span100 ft (30.5 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,600 (2022)
Projected traffic7,857 by 2044
Trucks2%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was EUCLID-S805 Onramp over S805 - E & W 54 Conns built?

It was built in 1974, making it 51 years old in 2025.

What condition is EUCLID-S805 Onramp over S805 - E & W 54 Conns in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does EUCLID-S805 Onramp over S805 - E & W 54 Conns carry?

About 5,600 vehicles per day (2022 count), of which roughly 2% are trucks.

How long is EUCLID-S805 Onramp over S805 - E & W 54 Conns?

The structure is 350 ft (106.7 m) long with a longest span of 100 ft (30.5 m) and a deck 26 ft wide.

Who owns EUCLID-S805 Onramp over S805 - E & W 54 Conns?

It is owned by the State Highway Agency.