N5-W76 Connector over San Luis Rey River
GoodSan Diego County, California · 11-SD-005-R54.06-OCN · Structure no. 57 0715G
- Built
- 1971
- 54 years old
- Condition
- Good
- inspected April 2024
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 419 ft
- 4 main spans
- Daily traffic
- 1
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
N5-W76 Connector over San Luis Rey River is a concrete continuous box beam or girders - multiple carrying N5-W76 Connector over San Luis Rey River in San Diego County, California. It was built in 1971, so it is 54 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1 vehicles a day, projected to reach 1 by 2045. The structure is 419 ft (127.7 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N5-W76 Connector over San Luis Rey River built?
It was built in 1971, making it 54 years old in 2025.
What condition is N5-W76 Connector over San Luis Rey River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does N5-W76 Connector over San Luis Rey River carry?
About 1 vehicles per day (2020 count).
How long is N5-W76 Connector over San Luis Rey River?
The structure is 419 ft (127.7 m) long with a longest span of 113 ft (34.4 m) and a deck 27 ft wide.
Who owns N5-W76 Connector over San Luis Rey River?
It is owned by the State Highway Agency.