US Bridges

Interstate 805 NB over Mission Center RD

Good

San Diego County, California · 11-SD-805-19.19-SD · Structure no. 57 0677R

Built
1972
53 years old, rebuilt 1982
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
205 ft
3 main spans
Daily traffic
101,500
2022 count
Owner
State
State Highway Agency

About this bridge

Interstate 805 NB over Mission Center RD is a concrete continuous box beam or girders - multiple carrying Interstate 805 NB over Mission Center RD in San Diego County, California. It was built in 1972 and reconstructed in 1982, so it is 53 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 101,500 vehicles a day, roughly 7% of them trucks, projected to reach 136,000 by 2046. The structure is 205 ft (62.5 m) long and 100 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesInterstate 805 NB
CrossesMission Center RD
Location11-SD-805-19.19-SD
RouteInterstate 805
Coordinates32.78896, -117.14837
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.1 US tons
Inventory rating42.9 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3 (+3 approach)
Design loadHS 20
Structure length205 ft (62.5 m)
Longest span105 ft (32 m)
Deck width100 ft (30.5 m)
Roadway width98 ft (29.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic101,500 (2022)
Projected traffic136,000 by 2046
Trucks7%
Lanes on structure6
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 805 NB over Mission Center RD built?

It was built in 1972, making it 53 years old in 2025. It was reconstructed in 1982.

What condition is Interstate 805 NB over Mission Center RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Interstate 805 NB over Mission Center RD carry?

About 101,500 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is Interstate 805 NB over Mission Center RD?

The structure is 205 ft (62.5 m) long with a longest span of 105 ft (32 m) and a deck 100 ft wide.

Who owns Interstate 805 NB over Mission Center RD?

It is owned by the State Highway Agency.