US Bridges

W94-N805 Connector over N805-HOME Ave Off-Ramp

Fair

San Diego County, California · 11-SD-094-4.12-SD · Structure no. 57 0670F

Built
1974
51 years old
Condition
Fair
inspected October 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
359 ft
3 main spans
Daily traffic
26,500
2016 count
Owner
State
State Highway Agency

About this bridge

W94-N805 Connector over N805-HOME Ave Off-Ramp is a prestressed concrete continuous box beam or girders - multiple carrying W94-N805 Connector over N805-HOME Ave Off-Ramp in San Diego County, California. It was built in 1974, so it is 51 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 26,500 vehicles a day, roughly 2% of them trucks, projected to reach 36,791 by 2045. The structure is 359 ft (109.4 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesW94-N805 Connector
CrossesN805-HOME Ave Off-Ramp
Location11-SD-094-4.12-SD
RouteState Highway 94
Coordinates32.72315, -117.10206
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.8 US tons
Inventory rating46.4 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length359 ft (109.4 m)
Longest span153 ft (46.6 m)
Deck width42 ft (12.8 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,500 (2016)
Projected traffic36,791 by 2045
Trucks2%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was W94-N805 Connector over N805-HOME Ave Off-Ramp built?

It was built in 1974, making it 51 years old in 2025.

What condition is W94-N805 Connector over N805-HOME Ave Off-Ramp in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does W94-N805 Connector over N805-HOME Ave Off-Ramp carry?

About 26,500 vehicles per day (2016 count), of which roughly 2% are trucks.

How long is W94-N805 Connector over N805-HOME Ave Off-Ramp?

The structure is 359 ft (109.4 m) long with a longest span of 153 ft (46.6 m) and a deck 42 ft wide.

Who owns W94-N805 Connector over N805-HOME Ave Off-Ramp?

It is owned by the State Highway Agency.