US Bridges

Interstate 5 SB over San Diego Riv Friars RD

Fair

San Diego County, California · 11-SD-005-R20.12-SD · Structure no. 57 0566L

Built
1969
56 years old
Condition
Fair
inspected September 2023
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
927 ft
10 main spans
Daily traffic
99,500
2020 count
Owner
State
State Highway Agency

About this bridge

Interstate 5 SB over San Diego Riv Friars RD is a concrete continuous box beam or girders - multiple carrying Interstate 5 SB over San Diego Riv Friars RD in San Diego County, California. It was built in 1969, so it is 56 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 99,500 vehicles a day, roughly 5% of them trucks, projected to reach 119,475 by 2040. The structure is 927 ft (282.5 m) long and 75 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesInterstate 5 SB
CrossesSan Diego Riv Friars RD
Location11-SD-005-R20.12-SD
RouteInterstate 5
Coordinates32.76, -117.20413
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74 US tons
Inventory rating44.6 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans10
Design loadHS 20
Structure length927 ft (282.5 m)
Longest span95 ft (29 m)
Deck width75 ft (22.9 m)
Roadway width73 ft (22.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic99,500 (2020)
Projected traffic119,475 by 2040
Trucks5%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Interstate 5 SB over San Diego Riv Friars RD built?

It was built in 1969, making it 56 years old in 2025.

What condition is Interstate 5 SB over San Diego Riv Friars RD in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Interstate 5 SB over San Diego Riv Friars RD carry?

About 99,500 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Interstate 5 SB over San Diego Riv Friars RD?

The structure is 927 ft (282.5 m) long with a longest span of 95 ft (29 m) and a deck 75 ft wide.

Who owns Interstate 5 SB over San Diego Riv Friars RD?

It is owned by the State Highway Agency.