Pershing DR-S5 on over B ST & Pershing DR-17 ST
GoodSan Diego County, California · 11-SD-005-R15.33-SD · Structure no. 57 0424K
- Built
- 1963
- 62 years old
- Condition
- Good
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 256 ft
- 2 main spans
- Daily traffic
- 6,800
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Pershing DR-S5 on over B ST & Pershing DR-17 ST is a concrete continuous box beam or girders - multiple carrying Pershing DR-S5 on over B ST & Pershing DR-17 ST in San Diego County, California. It was built in 1963, so it is 62 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,800 vehicles a day, roughly 2% of them trucks, projected to reach 8,244 by 2040. The structure is 256 ft (78 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pershing DR-S5 on over B ST & Pershing DR-17 ST built?
It was built in 1963, making it 62 years old in 2025.
What condition is Pershing DR-S5 on over B ST & Pershing DR-17 ST in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does Pershing DR-S5 on over B ST & Pershing DR-17 ST carry?
About 6,800 vehicles per day (2020 count), of which roughly 2% are trucks.
How long is Pershing DR-S5 on over B ST & Pershing DR-17 ST?
The structure is 256 ft (78 m) long with a longest span of 96 ft (29.3 m) and a deck 26 ft wide.
Who owns Pershing DR-S5 on over B ST & Pershing DR-17 ST?
It is owned by the State Highway Agency.