US Bridges

University Avenue over State Route 163

Fair

San Diego County, California · 11-SD-163-2.61-SD · Structure no. 57 0085

Built
1947
78 years old
Condition
Fair
inspected January 2025
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
119 ft
2 main spans
Daily traffic
28,400
2016 count
Owner
State
State Highway Agency

About this bridge

University Avenue over State Route 163 is a concrete continuous box beam or girders - multiple carrying University Avenue over State Route 163 in San Diego County, California. It was built in 1947, so it is 78 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 28,400 vehicles a day, roughly 3% of them trucks, projected to reach 37,658 by 2043. The structure is 119 ft (36.3 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUniversity Avenue
CrossesState Route 163
Location11-SD-163-2.61-SD
RouteCity Street 0S164
Coordinates32.74829, -117.15616
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.2 US tons
Inventory rating36.4 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length119 ft (36.3 m)
Longest span59 ft (18 m)
Deck width82 ft (24.9 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic28,400 (2016)
Projected traffic37,658 by 2043
Trucks3%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusEligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was University Avenue over State Route 163 built?

It was built in 1947, making it 78 years old in 2025.

What condition is University Avenue over State Route 163 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does University Avenue over State Route 163 carry?

About 28,400 vehicles per day (2016 count), of which roughly 3% are trucks.

How long is University Avenue over State Route 163?

The structure is 119 ft (36.3 m) long with a longest span of 59 ft (18 m) and a deck 82 ft wide.

Who owns University Avenue over State Route 163?

It is owned by the State Highway Agency.