Palm Avenue over BNSF RR Cajon Blvd
GoodSan Bernardino County, California · 0.3 MI SW of I-215 · Structure no. 54C0767
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 402 ft
- 3 main spans
- Daily traffic
- 3,714
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Palm Avenue over BNSF RR Cajon Blvd is a prestressed concrete continuous box beam or girders - multiple carrying Palm Avenue over BNSF RR Cajon Blvd in San Bernardino County, California. It was built in 2015, so it is 10 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,714 vehicles a day, roughly 2% of them trucks, projected to reach 6,607 by 2046. The structure is 402 ft (122.5 m) long and 40 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Palm Avenue over BNSF RR Cajon Blvd built?
It was built in 2015, making it 10 years old in 2025.
What condition is Palm Avenue over BNSF RR Cajon Blvd in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Palm Avenue over BNSF RR Cajon Blvd carry?
About 3,714 vehicles per day (2014 count), of which roughly 2% are trucks.
How long is Palm Avenue over BNSF RR Cajon Blvd?
The structure is 402 ft (122.5 m) long with a longest span of 151 ft (46 m) and a deck 40 ft wide.
Who owns Palm Avenue over BNSF RR Cajon Blvd?
It is owned by the City or Municipal Highway Agency.