US Bridges

Chino Ave over Cucamonga Creek Channel

Good

San Bernardino County, California · 0.2 MI W Archibald Ave · Structure no. 54C0529

Built
1979
46 years old, rebuilt 2018
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
109 ft
1 main span
Daily traffic
3,721
2012 count
Owner
City
City or Municipal Highway Agency

About this bridge

Chino Ave over Cucamonga Creek Channel is a prestressed concrete stringer/multi-beam or girder carrying Chino Ave over Cucamonga Creek Channel in San Bernardino County, California. It was built in 1979 and reconstructed in 2018, so it is 46 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,721 vehicles a day, roughly 7% of them trucks, projected to reach 6,516 by 2047. The structure is 109 ft (33.1 m) long and 86 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesChino Ave
CrossesCucamonga Creek Channel
Location0.2 MI W Archibald Ave
RouteCounty Highway 0
Coordinates34.01185, -117.60306
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.1 US tons
Inventory rating46.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length109 ft (33.1 m)
Longest span87 ft (26.5 m)
Deck width86 ft (26.2 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,721 (2012)
Projected traffic6,516 by 2047
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Chino Ave over Cucamonga Creek Channel built?

It was built in 1979, making it 46 years old in 2025. It was reconstructed in 2018.

What condition is Chino Ave over Cucamonga Creek Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Chino Ave over Cucamonga Creek Channel carry?

About 3,721 vehicles per day (2012 count), of which roughly 7% are trucks.

How long is Chino Ave over Cucamonga Creek Channel?

The structure is 109 ft (33.1 m) long with a longest span of 87 ft (26.5 m) and a deck 86 ft wide.

Who owns Chino Ave over Cucamonga Creek Channel?

It is owned by the City or Municipal Highway Agency.