Mission Blvd W Bnd over Cucamonga Creek Channel
FairSan Bernardino County, California · 0.4 MI W Archibald Ave · Structure no. 54C0525L
- Built
- 1979
- 46 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 82 ft
- 1 main span
- Daily traffic
- 12,082
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Mission Blvd W Bnd over Cucamonga Creek Channel is a prestressed concrete stringer/multi-beam or girder carrying Mission Blvd W Bnd over Cucamonga Creek Channel in San Bernardino County, California. It was built in 1979, so it is 46 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,082 vehicles a day, roughly 13% of them trucks, projected to reach 27,322 by 2042. The structure is 82 ft (25 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mission Blvd W Bnd over Cucamonga Creek Channel built?
It was built in 1979, making it 46 years old in 2025.
What condition is Mission Blvd W Bnd over Cucamonga Creek Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Mission Blvd W Bnd over Cucamonga Creek Channel carry?
About 12,082 vehicles per day (2019 count), of which roughly 13% are trucks.
How long is Mission Blvd W Bnd over Cucamonga Creek Channel?
The structure is 82 ft (25 m) long with a longest span of 78 ft (23.8 m) and a deck 32 ft wide.
Who owns Mission Blvd W Bnd over Cucamonga Creek Channel?
It is owned by the City or Municipal Highway Agency.