Carnelian Street over Redhill Park Resv Chan
GoodSan Bernardino County, California · 0.4 MI N of RTE 66 · Structure no. 54C0478
- Built
- 1936
- 89 years old, rebuilt 1981
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 31 ft
- 1 main span
- Daily traffic
- 20,613
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Carnelian Street over Redhill Park Resv Chan is a steel stringer/multi-beam or girder carrying Carnelian Street over Redhill Park Resv Chan in San Bernardino County, California. It was built in 1936 and reconstructed in 1981, so it is 89 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20,613 vehicles a day, roughly 3% of them trucks, projected to reach 26,080 by 2043. The structure is 31 ft (9.4 m) long and 69 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Carnelian Street over Redhill Park Resv Chan built?
It was built in 1936, making it 89 years old in 2025. It was reconstructed in 1981.
What condition is Carnelian Street over Redhill Park Resv Chan in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Carnelian Street over Redhill Park Resv Chan carry?
About 20,613 vehicles per day (2019 count), of which roughly 3% are trucks.
How long is Carnelian Street over Redhill Park Resv Chan?
The structure is 31 ft (9.4 m) long with a longest span of 30 ft (9.1 m) and a deck 69 ft wide.
Who owns Carnelian Street over Redhill Park Resv Chan?
It is owned by the City or Municipal Highway Agency.