US Bridges

Gilbert ST over East Twin Creek Channel

Good

San Bernardino County, California · 0.75 MI E Waterman Ave · Structure no. 54C0457

Built
1961
64 years old
Condition
Good
inspected January 2022
Type
Slab
Concrete
Length
54 ft
1 main span
Daily traffic
11,361
2014 count
Owner
City
City or Municipal Highway Agency

About this bridge

Gilbert ST over East Twin Creek Channel is a concrete slab carrying Gilbert ST over East Twin Creek Channel in San Bernardino County, California. It was built in 1961, so it is 64 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,361 vehicles a day, roughly 2% of them trucks, projected to reach 13,216 by 2043. The structure is 54 ft (16.5 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGilbert ST
CrossesEast Twin Creek Channel
Location0.75 MI E Waterman Ave
RouteCounty Highway 0
Coordinates34.12688, -117.26577
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJanuary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating105.4 US tons
Inventory rating63.6 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length54 ft (16.5 m)
Longest span48 ft (14.6 m)
Deck width48 ft (14.7 m)
Roadway width38 ft (11.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,361 (2014)
Projected traffic13,216 by 2043
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Gilbert ST over East Twin Creek Channel built?

It was built in 1961, making it 64 years old in 2025.

What condition is Gilbert ST over East Twin Creek Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2022.

How much traffic does Gilbert ST over East Twin Creek Channel carry?

About 11,361 vehicles per day (2014 count), of which roughly 2% are trucks.

How long is Gilbert ST over East Twin Creek Channel?

The structure is 54 ft (16.5 m) long with a longest span of 48 ft (14.6 m) and a deck 48 ft wide.

Who owns Gilbert ST over East Twin Creek Channel?

It is owned by the City or Municipal Highway Agency.