Nat Trails HWY over High Ditch
FairSan Bernardino County, California · 4.7 MI E Crucero RD · Structure no. 54C0237
- Built
- 1930
- 95 years old, rebuilt 1953
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 40 ft
- 2 main spans
- Daily traffic
- 230
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Nat Trails HWY over High Ditch is a wood or timber stringer/multi-beam or girder carrying Nat Trails HWY over High Ditch in San Bernardino County, California. It was built in 1930 and reconstructed in 1953, so it is 95 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 230 vehicles a day, roughly 20% of them trucks, projected to reach 281 by 2044. The structure is 40 ft (12.2 m) long and 28 ft wide. If it were closed, the detour would be 39.8 mi (64 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nat Trails HWY over High Ditch built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1953.
What condition is Nat Trails HWY over High Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Nat Trails HWY over High Ditch carry?
About 230 vehicles per day (2015 count), of which roughly 20% are trucks.
How long is Nat Trails HWY over High Ditch?
The structure is 40 ft (12.2 m) long with a longest span of 19 ft (5.8 m) and a deck 28 ft wide.
Who owns Nat Trails HWY over High Ditch?
It is owned by the County Highway Agency.