Cherry Avenue over Hawker-Crawford Channel
GoodSan Bernardino County, California · 0.25 MI N of I-15 · Structure no. 54C0224
- Built
- 1976
- 49 years old
- Condition
- Good
- inspected May 2022
- Type
- Slab
- Prestressed Concrete
- Length
- 54 ft
- 1 main span
- Daily traffic
- 9,800
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Cherry Avenue over Hawker-Crawford Channel is a prestressed concrete slab carrying Cherry Avenue over Hawker-Crawford Channel in San Bernardino County, California. It was built in 1976, so it is 49 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,800 vehicles a day, roughly 2% of them trucks, projected to reach 27,453 by 2044. The structure is 54 ft (16.6 m) long and 52 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cherry Avenue over Hawker-Crawford Channel built?
It was built in 1976, making it 49 years old in 2025.
What condition is Cherry Avenue over Hawker-Crawford Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.
How much traffic does Cherry Avenue over Hawker-Crawford Channel carry?
About 9,800 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Cherry Avenue over Hawker-Crawford Channel?
The structure is 54 ft (16.6 m) long with a longest span of 52 ft (15.8 m) and a deck 52 ft wide.
Who owns Cherry Avenue over Hawker-Crawford Channel?
It is owned by the City or Municipal Highway Agency.