US Bridges

30th Street over East Twin Creek Channel

Fair

San Bernardino County, California · 0.15 MI E of Valencia Ave · Structure no. 54C0124

Built
1968
57 years old
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
117 ft
1 main span
Daily traffic
12,240
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

30th Street over East Twin Creek Channel is a prestressed concrete stringer/multi-beam or girder carrying 30th Street over East Twin Creek Channel in San Bernardino County, California. It was built in 1968, so it is 57 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,240 vehicles a day, roughly 3% of them trucks, projected to reach 15,750 by 2044. The structure is 117 ft (35.7 m) long and 72 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries30th Street
CrossesEast Twin Creek Channel
Location0.15 MI E of Valencia Ave
RouteCity Street 0
Coordinates34.14513, -117.26906
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length117 ft (35.7 m)
Longest span67 ft (20.4 m)
Deck width72 ft (21.9 m)
Roadway width65 ft (19.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,240 (2024)
Projected traffic15,750 by 2044
Trucks3%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 30th Street over East Twin Creek Channel built?

It was built in 1968, making it 57 years old in 2025.

What condition is 30th Street over East Twin Creek Channel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does 30th Street over East Twin Creek Channel carry?

About 12,240 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is 30th Street over East Twin Creek Channel?

The structure is 117 ft (35.7 m) long with a longest span of 67 ft (20.4 m) and a deck 72 ft wide.

Who owns 30th Street over East Twin Creek Channel?

It is owned by the City or Municipal Highway Agency.