Westbound I-40 over Van Winkle Wash
FairSan Bernardino County, California · 08-SBD-040-R85.19 · Structure no. 54 1298L
- Built
- 2014
- 11 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 250 ft
- 3 main spans
- Daily traffic
- 8,500
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
Westbound I-40 over Van Winkle Wash is a prestressed concrete stringer/multi-beam or girder carrying Westbound I-40 over Van Winkle Wash in San Bernardino County, California. It was built in 2014, so it is 11 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,500 vehicles a day, roughly 40% of them trucks, projected to reach 13,041 by 2047. The structure is 250 ft (76.2 m) long and 43 ft wide. If it were closed, the detour would be 31.1 mi (50 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Westbound I-40 over Van Winkle Wash built?
It was built in 2014, making it 11 years old in 2025.
What condition is Westbound I-40 over Van Winkle Wash in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does Westbound I-40 over Van Winkle Wash carry?
About 8,500 vehicles per day (2018 count), of which roughly 40% are trucks.
How long is Westbound I-40 over Van Winkle Wash?
The structure is 250 ft (76.2 m) long with a longest span of 100 ft (30.5 m) and a deck 43 ft wide.
Who owns Westbound I-40 over Van Winkle Wash?
It is owned by the State Highway Agency.