US Bridges

Pacheco Highway over Tequisquita Slough

Good

San Benito County, California · 1.1 MI S Fairway RD · Structure no. 43C0049

Built
1920
105 years old, rebuilt 1966
Condition
Good
inspected January 2025
Type
Slab
Concrete Continuous
Length
49 ft
3 main spans
Daily traffic
400
2010 count
Owner
County
County Highway Agency

About this bridge

Pacheco Highway over Tequisquita Slough is a concrete continuous slab carrying Pacheco Highway over Tequisquita Slough in San Benito County, California. It was built in 1920 and reconstructed in 1966, so it is 105 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 400 vehicles a day, roughly 5% of them trucks, projected to reach 530 by 2047. The structure is 49 ft (14.9 m) long and 43 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesPacheco Highway
CrossesTequisquita Slough
Location1.1 MI S Fairway RD
RouteCounty Highway 0
Coordinates36.91732, -121.39181
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating29.7 US tons
Inventory rating17.9 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length49 ft (14.9 m)
Longest span16 ft (4.9 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic400 (2010)
Projected traffic530 by 2047
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pacheco Highway over Tequisquita Slough built?

It was built in 1920, making it 105 years old in 2025. It was reconstructed in 1966.

What condition is Pacheco Highway over Tequisquita Slough in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Pacheco Highway over Tequisquita Slough carry?

About 400 vehicles per day (2010 count), of which roughly 5% are trucks.

How long is Pacheco Highway over Tequisquita Slough?

The structure is 49 ft (14.9 m) long with a longest span of 16 ft (4.9 m) and a deck 43 ft wide.

Who owns Pacheco Highway over Tequisquita Slough?

It is owned by the County Highway Agency.