Bradshaw & Sheldon over Laguna Creek East Branch
GoodSacramento County, California · Bradshaw & Sheldon RD · Structure no. 24C0636
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected October 2024
- Type
- Culvert
- Concrete
- Length
- 35 ft
- 3 main spans
- Daily traffic
- 28,716
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Bradshaw & Sheldon over Laguna Creek East Branch is a concrete culvert carrying Bradshaw & Sheldon over Laguna Creek East Branch in Sacramento County, California. It was built in 2018, so it is 7 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 28,716 vehicles a day, roughly 10% of them trucks, projected to reach 37,330 by 2042. The structure is 35 ft (10.8 m) long. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bradshaw & Sheldon over Laguna Creek East Branch built?
It was built in 2018, making it 7 years old in 2025.
What condition is Bradshaw & Sheldon over Laguna Creek East Branch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Bradshaw & Sheldon over Laguna Creek East Branch carry?
About 28,716 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is Bradshaw & Sheldon over Laguna Creek East Branch?
The structure is 35 ft (10.8 m) long with a longest span of 11 ft (3.3 m).
Who owns Bradshaw & Sheldon over Laguna Creek East Branch?
It is owned by the City or Municipal Highway Agency.