US Bridges

Parkshore DR over Willow Creek

Good

Sacramento County, California · 0.1 MI N of Plaza DR · Structure no. 24C0631

Built
2000
25 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
68 ft
1 main span
Daily traffic
500
2016 count
Owner
City
City or Municipal Highway Agency

About this bridge

Parkshore DR over Willow Creek is a prestressed concrete stringer/multi-beam or girder carrying Parkshore DR over Willow Creek in Sacramento County, California. It was built in 2000, so it is 25 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, roughly 8% of them trucks, projected to reach 870 by 2046. The structure is 68 ft (20.7 m) long and 62 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesParkshore DR
CrossesWillow Creek
Location0.1 MI N of Plaza DR
RouteCity Street 0
Coordinates38.65773, -121.17607
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length68 ft (20.7 m)
Longest span66 ft (20 m)
Deck width62 ft (18.9 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2016)
Projected traffic870 by 2046
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Parkshore DR over Willow Creek built?

It was built in 2000, making it 25 years old in 2025.

What condition is Parkshore DR over Willow Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Parkshore DR over Willow Creek carry?

About 500 vehicles per day (2016 count), of which roughly 8% are trucks.

How long is Parkshore DR over Willow Creek?

The structure is 68 ft (20.7 m) long with a longest span of 66 ft (20 m) and a deck 62 ft wide.

Who owns Parkshore DR over Willow Creek?

It is owned by the City or Municipal Highway Agency.