US Bridges

Club Center Drive over East Drainage Canal

Fair

Sacramento County, California · East of Natomas Blvd · Structure no. 24C0596

Built
2000
25 years old
Condition
Fair
inspected May 2024
Type
Slab
Concrete Continuous
Length
135 ft
3 main spans
Daily traffic
3,154
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Club Center Drive over East Drainage Canal is a concrete continuous slab carrying Club Center Drive over East Drainage Canal in Sacramento County, California. It was built in 2000, so it is 25 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,154 vehicles a day, roughly 2% of them trucks, projected to reach 4,282 by 2044. The structure is 135 ft (41 m) long and 86 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesClub Center Drive
CrossesEast Drainage Canal
LocationEast of Natomas Blvd
RouteCity Street 0
Coordinates38.67069, -121.50754
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating37.5 US tons
Inventory rating25.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length135 ft (41 m)
Longest span44 ft (13.4 m)
Deck width86 ft (26.2 m)
Roadway width72 ft (21.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,154 (2011)
Projected traffic4,282 by 2044
Trucks2%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Club Center Drive over East Drainage Canal built?

It was built in 2000, making it 25 years old in 2025.

What condition is Club Center Drive over East Drainage Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does Club Center Drive over East Drainage Canal carry?

About 3,154 vehicles per day (2011 count), of which roughly 2% are trucks.

How long is Club Center Drive over East Drainage Canal?

The structure is 135 ft (41 m) long with a longest span of 44 ft (13.4 m) and a deck 86 ft wide.

Who owns Club Center Drive over East Drainage Canal?

It is owned by the City or Municipal Highway Agency.