US Bridges

Alan Boyd DR over Arrival Access Roadway

Fair

Sacramento County, California · Sac. Intl. Airport · Structure no. 24C0582

Built
2011
14 years old
Condition
Fair
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
1,909 ft
27 main spans
Daily traffic
800
2012 count
Owner
County
County Highway Agency

About this bridge

Alan Boyd DR over Arrival Access Roadway is a prestressed concrete continuous box beam or girders - multiple carrying Alan Boyd DR over Arrival Access Roadway in Sacramento County, California. It was built in 2011, so it is 14 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 800 vehicles a day, projected to reach 1,045 by 2042. The structure is 1,909 ft (582 m) long and 32 ft wide.

CarriesAlan Boyd DR
CrossesArrival Access Roadway
LocationSac. Intl. Airport
RouteCounty Highway 0
Coordinates38.69061, -121.59222
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans27
Design loadUnknown
Structure length1,909 ft (582 m)
Longest span88 ft (26.8 m)
Deck width32 ft (9.7 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deck15 ft (4.7 m)

Traffic and service

Average daily traffic800 (2012)
Projected traffic1,045 by 2042
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Alan Boyd DR over Arrival Access Roadway built?

It was built in 2011, making it 14 years old in 2025.

What condition is Alan Boyd DR over Arrival Access Roadway in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Alan Boyd DR over Arrival Access Roadway carry?

About 800 vehicles per day (2012 count).

How long is Alan Boyd DR over Arrival Access Roadway?

The structure is 1,909 ft (582 m) long with a longest span of 88 ft (26.8 m) and a deck 32 ft wide.

Who owns Alan Boyd DR over Arrival Access Roadway?

It is owned by the County Highway Agency.