West El Camino Ave over Natomas E Main Drain Cnl
GoodSacramento County, California · 0.4 MI E of Northgate Blv · Structure no. 24C0540
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected October 2024
- Type
- Slab
- Prestressed Concrete Continuous
- Length
- 326 ft
- 6 main spans
- Daily traffic
- 12,744
- 2013 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
West El Camino Ave over Natomas E Main Drain Cnl is a prestressed concrete continuous slab carrying West El Camino Ave over Natomas E Main Drain Cnl in Sacramento County, California. It was built in 2009, so it is 16 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,744 vehicles a day, roughly 3% of them trucks, projected to reach 24,566 by 2044. The structure is 326 ft (99.3 m) long and 56 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was West El Camino Ave over Natomas E Main Drain Cnl built?
It was built in 2009, making it 16 years old in 2025.
What condition is West El Camino Ave over Natomas E Main Drain Cnl in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does West El Camino Ave over Natomas E Main Drain Cnl carry?
About 12,744 vehicles per day (2013 count), of which roughly 3% are trucks.
How long is West El Camino Ave over Natomas E Main Drain Cnl?
The structure is 326 ft (99.3 m) long with a longest span of 68 ft (20.7 m) and a deck 56 ft wide.
Who owns West El Camino Ave over Natomas E Main Drain Cnl?
It is owned by the City or Municipal Highway Agency.