El Verano Road over East Canal Tributary 2
FairSacramento County, California · 500 N/O Elverta Road · Structure no. 24C0439
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected January 2024
- Type
- Culvert
- Concrete Continuous
- Length
- 24 ft
- 2 main spans
- Daily traffic
- 4,000
- 2002 count
- Owner
- County
- County Highway Agency
About this bridge
El Verano Road over East Canal Tributary 2 is a concrete continuous culvert carrying El Verano Road over East Canal Tributary 2 in Sacramento County, California. It was built in 1980, so it is 45 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,000 vehicles a day, roughly 5% of them trucks, projected to reach 5,544 by 2046. The structure is 24 ft (7.3 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was El Verano Road over East Canal Tributary 2 built?
It was built in 1980, making it 45 years old in 2025.
What condition is El Verano Road over East Canal Tributary 2 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does El Verano Road over East Canal Tributary 2 carry?
About 4,000 vehicles per day (2002 count), of which roughly 5% are trucks.
How long is El Verano Road over East Canal Tributary 2?
The structure is 24 ft (7.3 m) long with a longest span of 12 ft (3.7 m) and a deck 33 ft wide.
Who owns El Verano Road over East Canal Tributary 2?
It is owned by the County Highway Agency.