N Market Blvd EB over East Main Drainage Canal
FairSacramento County, California · 0.1 Mi. E. of Truxel RD · Structure no. 24C0382R
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected January 2024
- Type
- Slab
- Concrete Continuous
- Length
- 92 ft
- 3 main spans
- Daily traffic
- 5,130
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
N Market Blvd EB over East Main Drainage Canal is a concrete continuous slab carrying N Market Blvd EB over East Main Drainage Canal in Sacramento County, California. It was built in 1986, so it is 39 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,130 vehicles a day, roughly 30% of them trucks, projected to reach 6,564 by 2042. The structure is 92 ft (28 m) long and 43 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N Market Blvd EB over East Main Drainage Canal built?
It was built in 1986, making it 39 years old in 2025.
What condition is N Market Blvd EB over East Main Drainage Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does N Market Blvd EB over East Main Drainage Canal carry?
About 5,130 vehicles per day (2018 count), of which roughly 30% are trucks.
How long is N Market Blvd EB over East Main Drainage Canal?
The structure is 92 ft (28 m) long with a longest span of 24 ft (7.3 m) and a deck 43 ft wide.
Who owns N Market Blvd EB over East Main Drainage Canal?
It is owned by the City or Municipal Highway Agency.