Discovery Pk RD over Natomas East Main Drain
GoodSacramento County, California · Garden Highway · Structure no. 24C0360
- Built
- 1970
- 55 years old
- Condition
- Good
- inspected October 2021
- Type
- Tee Beam
- Prestressed Concrete Continuous
- Length
- 240 ft
- 6 main spans
- Daily traffic
- 1,800
- 2004 count
- Owner
- County
- County Highway Agency
About this bridge
Discovery Pk RD over Natomas East Main Drain is a prestressed concrete continuous tee beam carrying Discovery Pk RD over Natomas East Main Drain in Sacramento County, California. It was built in 1970, so it is 55 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,800 vehicles a day, roughly 10% of them trucks, projected to reach 5,123 by 2043. The structure is 240 ft (73.2 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Discovery Pk RD over Natomas East Main Drain built?
It was built in 1970, making it 55 years old in 2025.
What condition is Discovery Pk RD over Natomas East Main Drain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2021.
How much traffic does Discovery Pk RD over Natomas East Main Drain carry?
About 1,800 vehicles per day (2004 count), of which roughly 10% are trucks.
How long is Discovery Pk RD over Natomas East Main Drain?
The structure is 240 ft (73.2 m) long with a longest span of 40 ft (12.2 m) and a deck 37 ft wide.
Who owns Discovery Pk RD over Natomas East Main Drain?
It is owned by the County Highway Agency.