Center Parkway SB over Elder Creek
FairSacramento County, California · 0.1 MI N of Mack RD · Structure no. 24C0219L
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected April 2024
- Type
- Slab
- Concrete Continuous
- Length
- 84 ft
- 5 main spans
- Daily traffic
- 4,661
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Center Parkway SB over Elder Creek is a concrete continuous slab carrying Center Parkway SB over Elder Creek in Sacramento County, California. It was built in 1960, so it is 65 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,661 vehicles a day, roughly 10% of them trucks, projected to reach 18,787 by 2044. The structure is 84 ft (25.5 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Center Parkway SB over Elder Creek built?
It was built in 1960, making it 65 years old in 2025.
What condition is Center Parkway SB over Elder Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Center Parkway SB over Elder Creek carry?
About 4,661 vehicles per day (2017 count), of which roughly 10% are trucks.
How long is Center Parkway SB over Elder Creek?
The structure is 84 ft (25.5 m) long with a longest span of 18 ft (5.6 m) and a deck 37 ft wide.
Who owns Center Parkway SB over Elder Creek?
It is owned by the City or Municipal Highway Agency.