Grant Line RD over Folsom South Canal
GoodSacramento County, California · 0.1 MI W/O Sunrise Blvd · Structure no. 24C0181
- Built
- 1970
- 55 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 96 ft
- 1 main span
- Daily traffic
- 14,977
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Grant Line RD over Folsom South Canal is a prestressed concrete stringer/multi-beam or girder carrying Grant Line RD over Folsom South Canal in Sacramento County, California. It was built in 1970, so it is 55 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,977 vehicles a day, roughly 10% of them trucks, projected to reach 24,254 by 2043. The structure is 96 ft (29.4 m) long and 52 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Grant Line RD over Folsom South Canal built?
It was built in 1970, making it 55 years old in 2025.
What condition is Grant Line RD over Folsom South Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Grant Line RD over Folsom South Canal carry?
About 14,977 vehicles per day (2014 count), of which roughly 10% are trucks.
How long is Grant Line RD over Folsom South Canal?
The structure is 96 ft (29.4 m) long with a longest span of 94 ft (28.5 m) and a deck 52 ft wide.
Who owns Grant Line RD over Folsom South Canal?
It is owned by the County Highway Agency.