US Bridges

Interstate 5 NB over Lost Slough

Good

Sacramento County, California · 03-SAC-005-1.04 · Structure no. 24 0261R

Built
1979
46 years old
Condition
Good
inspected April 2024
Type
Tee Beam
Concrete Continuous
Length
929 ft
16 main spans
Daily traffic
26,500
2015 count
Owner
State
State Highway Agency

About this bridge

Interstate 5 NB over Lost Slough is a concrete continuous tee beam carrying Interstate 5 NB over Lost Slough in Sacramento County, California. It was built in 1979, so it is 46 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26,500 vehicles a day, roughly 25% of them trucks, projected to reach 53,777 by 2046. The structure is 929 ft (283.3 m) long and 42 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesInterstate 5 NB
CrossesLost Slough
Location03-SAC-005-1.04
RouteInterstate 5
Coordinates38.26906, -121.45308
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.7 US tons
Inventory rating33.2 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans16
Design loadHS 20
Structure length929 ft (283.3 m)
Longest span60 ft (18.3 m)
Deck width42 ft (12.8 m)
Roadway width38 ft (11.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,500 (2015)
Projected traffic53,777 by 2046
Trucks25%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Interstate 5 NB over Lost Slough built?

It was built in 1979, making it 46 years old in 2025.

What condition is Interstate 5 NB over Lost Slough in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Interstate 5 NB over Lost Slough carry?

About 26,500 vehicles per day (2015 count), of which roughly 25% are trucks.

How long is Interstate 5 NB over Lost Slough?

The structure is 929 ft (283.3 m) long with a longest span of 60 ft (18.3 m) and a deck 42 ft wide.

Who owns Interstate 5 NB over Lost Slough?

It is owned by the State Highway Agency.