E Nuevo Road over Perris Valley Storm Drn
GoodRiverside County, California · 1.55 Mi. E/O Rte. 215 Fwy · Structure no. 56C0652
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 214 ft
- 2 main spans
- Daily traffic
- 16,020
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
E Nuevo Road over Perris Valley Storm Drn is a prestressed concrete box beam or girders - multiple carrying E Nuevo Road over Perris Valley Storm Drn in Riverside County, California. It was built in 2021, so it is 4 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 16,020 vehicles a day, roughly 5% of them trucks, projected to reach 17,634 by 2043. The structure is 214 ft (65.2 m) long and 114 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E Nuevo Road over Perris Valley Storm Drn built?
It was built in 2021, making it 4 years old in 2025.
What condition is E Nuevo Road over Perris Valley Storm Drn in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does E Nuevo Road over Perris Valley Storm Drn carry?
About 16,020 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is E Nuevo Road over Perris Valley Storm Drn?
The structure is 214 ft (65.2 m) long with a longest span of 106 ft (32.2 m) and a deck 114 ft wide.
Who owns E Nuevo Road over Perris Valley Storm Drn?
It is owned by the City or Municipal Highway Agency.